Commit graph

13 commits

Author SHA1 Message Date
Oriol Roqué Paniagua
d26e08bffd Merged PR 3909: Fixes created_date_utc and updated_date_utc in SH User and its dependencies
# Description

The model `stg_core__superhog_user` contained the fields `created_date_utc` and `updated_date_utc`, which were actually timestamps, not dates. This created issues a while ago in KPIs that were fixed by forcing a date conversion at `int_kpis` level, but the source issue remained unfixed.

This PR just creates the proper fields in staging, meaning:
* `created_at_utc` and `created_date_utc`
* `updated_at_utc` and `updated_date_utc`

And propagates the changes through all dependencies. On KPIs, it also removes the hardcoded date conversion since it's no longer needed. It also adds the different schema entries on which these fields were already defined. Note I didn't update the staging entry since there's no entry for the rest of the fields.

I recommend checking this PR in the commits order.

What I've tested:
* Unified User and User Host have plenty of dependencies that I've checked one by one, at each dependency layer by using dbt docs.
* Run `core__unified_user` and the full execution of +`mtd_aggregated_metrics`

What clearly will fail:
* There's the famous `Users_dashboard` PBI report that shouldn't exist that has a dependency with `core__unified_user`. This report will fail. But it does not exist. I'd like to drop it once and forever

# Checklist

- [X] The edited models and dependants run properly with production data. **See above**
- [X] The edited models are sufficiently documented.
- [X] The edited models contain PK tests, and I've ran and passed them.
- [X] I have checked for DRY opportunities with other models and docs.
- [X] I've picked the right materialization for the affected models.

# Other

- [X] Check if a full-refresh is required after this PR is merged. **The staging model is incremental!**

Related work items: #23703
2024-12-31 08:04:03 +00:00
Joaquin Ossa
4569c5d0da Added the has_user_moved_from_old_dash field 2024-12-13 10:56:56 +01:00
Oriol Roqué Paniagua
321f48ca7d Merged PR 3506: Remove Address Validation
# Description

Removes Address Validation within DWH.
Note that I keep the 2 reporting fields, nullified. These should be removed after the removal of these fields in PBI.

# Checklist

- [X] The edited models and dependants run properly with production data.
- [NA] The edited models are sufficiently documented.
- [X] The edited models contain PK tests, and I've ran and passed them.
- [NA] I have checked for DRY opportunities with other models and docs.
- [NA] I've picked the right materialization for the affected models.

# Other

- [ ] Check if a full-refresh is required after this PR is merged.

Related work items: #23976
2024-11-14 11:59:36 +00:00
Joaquin Ossa
6f77309b8c addressed comments 2024-11-12 17:10:42 +01:00
Joaquin Ossa
463f5edfc3 new dash new data 2024-11-12 16:33:55 +01:00
Oriol Roqué Paniagua
5735251c67 Merged PR 3239: Decommission Verification Payments V1
# Description

Decoms verification payments v1 version, and keeps v2 alive. The PBI of Guest Payments (Biz Overview) was already switched to V2 but the exposures was not reflecting it, so I changed this. Then I dropped all v1 models for verification payments and their entries in schema.

# Checklist

- [X] The edited models and dependants run properly with production data. I did run the upstream dependencies on V2 and I don't see orphans in my dbt docs. However I did not fully run end-to-end all models up to PBI reports since there's other sources involved (Xero, etc).
- [X] The edited models are sufficiently documented.
- [X] The edited models contain PK tests, and I've ran and passed them.
- [NA] I have checked for DRY opportunities with other models and docs.
- [NA] I've picked the right materialization for the affected models.

# Other

- [ ] Check if a full-refresh is required after this PR is merged.

Related work items: #22611
2024-10-18 09:59:29 +00:00
Oriol Roqué Paniagua
feaedb2a06 Merged PR 2911: Bugfix core__bookings failing dbt test
# Description

Fixes issue

# Checklist

- [ ] The edited models and dependants run properly with production data.
- [ ] The edited models are sufficiently documented.
- [ ] The edited models contain PK tests, and I've ran and passed them.
- [ ] I have checked for DRY opportunities with other models and docs.
- [ ] I've picked the right materialization for the affected models.

# Other

- [ ] Check if a full-refresh is required after this PR is merged.
2024-09-19 07:00:15 +00:00
Joaquin Ossa
01eca0dbcc Merged PR 2877: Update model core__verification_payments to include amounts without taxes
# Description

Update model core__verification_payments to include guest payment amounts without taxes

# Checklist

- [x] The edited models and dependants run properly with production data.
- [x] The edited models are sufficiently documented.
- [x] The edited models contain PK tests, and I've ran and passed them.
- [ ] I have checked for DRY opportunities with other models and docs.
- [ ] I've picked the right materialization for the affected models.

# Other

- [ ] Check if a full-refresh is required after this PR is merged.
2024-09-18 14:30:23 +00:00
Joaquin Ossa
923bfa7091 Update exposures to pull from version 1 2024-09-18 14:20:48 +02:00
Oriol Roqué Paniagua
985ddb8e4d Merged PR 2887: Check-In Hero - Removing unused fields + schema changes
# Description
This PR closes the ticket #20046

Changes:
* Removes temporary fields marked as legacy in `core__vr_check_in_cover`, after the changes in the 3 PBI Check-In Hero reports.
* Additionally, I modified the schema entry to comply with the current fields available in this model.

# Checklist

- [X] The edited models and dependants run properly with production data. *Checked in local changing the sources to localhost after dropping the fields.*
- [X] The edited models are sufficiently documented.
- [X] The edited models contain PK tests, and I've ran and passed them.
- [ ] I have checked for DRY opportunities with other models and docs. *N/A*
- [ ] I've picked the right materialization for the affected models. *N/A*

# Other

- [ ] Check if a full-refresh is required after this PR is merged.

Remove temporary fields

Related work items: #20046
2024-09-18 11:48:49 +00:00
Joaquin Ossa
40bfa60016 core__verification_payments_v2 2024-09-18 12:41:00 +02:00
Joaquin Ossa
78e7e37c5e Update model core__verification_payments to include amounts without taxes 2024-09-17 17:22:37 +02:00
Pablo Martin
df16cdb00c reporting schema 2024-09-12 15:39:49 +02:00
Renamed from models/reporting/core/schema.yaml (Browse further)