Commit graph

2 commits

Author SHA1 Message Date
Oriol Roqué Paniagua
06603d01e2 Merged PR 3810: Adds is_end_of_month_or_yesterday for Main KPIs
# Description

Adds `is_end_of_month_or_yesterday` for Main KPIs.
Apparently, the fact that we do not show the ongoing value of the month on some tabs of Main KPIs is the main blocker for Ben C to consistently use Main KPIs, which he actually retrieves from the SH legacy reporting. Since I'm sceptical about the data shown there, I want to remove this blocker.
It will require a small PR on PBI as well.

# Checklist

- [X] The edited models and dependants run properly with production data.
- [X] The edited models are sufficiently documented.
- [X] The edited models contain PK tests, and I've ran and passed them.
- [X] I have checked for DRY opportunities with other models and docs.
- [NA] I've picked the right materialization for the affected models.

# Other

- [ ] Check if a full-refresh is required after this PR is merged.

Related work items: #25342
2024-12-09 16:13:52 +00:00
Oriol Roqué Paniagua
9ba0edb82d Merged PR 3482: Adapts date dimension skeleton for Main KPIs
# Description

New model:
* int_kpis__agg_dates_main_kpis - Serves as the skeleton of dates and dimensions for Main KPIs. It's aggregated since it follows a similar aggregation strategy. It's a single model to feed both Main KPIs visualisations. Note boolean fields are real booleans (true/false) while before these were integers (1/0). This also affects downstream models.

Main KPIs flow adaptations to new skeleton model:
* int_monthly_aggregated_metrics_history_by_deal
* int_monthly_churn_metrics - additionally, calls usual KPIs macro instead of old one
* int_mtd_vs_previous_year_metrics

Reporting changes to ensure report is not down:
* mtd_aggregated_metrics - adaptations on booleans (true-1, false-0)

Cleaning:
* get_kpi_dimensions macro is no longer used
* int_dates_by_deal model and schema entry
* int_dates_mtd_by_dimension model and schema entry
* int_dates_mtd model and schema entry

# Checklist

- [X] The edited models and dependants run properly with production data.
- [X] The edited models are sufficiently documented.
- [X] The edited models contain PK tests, and I've ran and passed them.
- [X] I have checked for DRY opportunities with other models and docs.
- [X] I've picked the right materialization for the affected models.

# Other

- [ ] Check if a full-refresh is required after this PR is merged.

Related work items: #23763
2024-11-11 15:57:37 +00:00